CS446 Delivery Dates
-
September 30
-
Programming calibration assignment due.
-
October 7
-
Installation calibration assignment due.
-
October 11
-
Preliminary System Design Due.
-
October 18
-
System Design Due.
-
October 25
-
System Test Plan Due.
-
November 1
-
Team Schedule Due.
-
November 25
-
System Delivery.
-
December 2
-
Maintenance Delivery and Wrap-up.
-
Requirements
A
statement of the requirements for the system
may be referenced through this link.